THE Metropolitan Manila Development Authority (MMDA) has proposed the construction of rainwater impounding facilities inside Camp Aguinaldo to ease recurring flooding on EDSA, with the proposed design released on Wednesday, Aug. 27.
The plan requires detention ponds that will temporarily store excess rainwater during downpours and gradually release it into the EDSA drainage system, leading to the Makiling Creek.
As proposed, the project will be implemented in three phases, covering 182 hectares and involving a golf course near Gate 2, another near Gates 3 and 4, and an open space near Gate 6.
MMDA proposes rainwater facilities in Camp Aguinaldo to mitigate EDSA flooding
For the first phase near Gate 2, the detention pond has a 361-meter perimeter, a 4,650-square-meter area, an 8-meter depth, and a 37,200-cubic-meter capacity, designed for a 25-year return period (15.6 mm per hour over 24 hours), exceeding the needed 36,945 cubic meters.
MMDA’s schematic shows that under normal weather, the water bypasses the pond and flows through the lagoon to EDSA.

During heavy rain, floodgates divert water flow into the pond; after rain, pumps discharge stored water slowly into EDSA toward the Makiling Creek.
The scope of works covers the impounding area, operations and powerhouse, drainage and electromechanical works, and landscaping and golf course restoration, with a treatment facility under consideration., This news data comes from:http://705-888.com
Officials said operations and maintenance arrangements, and a memorandum of agreement, are still under discussion.
- Macron says 26 countries pledge troops as a reassurance force for Ukraine after war ends
- DILG denies allegations that PNP chief fired over firearms deal
- US warship heading toward Caribbean Sea
- Gasoline, diesel prices to increase by P1 next week
- Putin facing mounting pressure from the West
- Marcos suspends importation of regular, well-milled rice for 60 days
- Comelec: Postponed village, youth elections not in 2026 budget
- LPA over West PH Sea develops into tropical depression, now called ‘Jacinto’ -- Pagasa
- Palace: Govt monitoring Chinese sleeper agents, PLA presence in PH
- Hope dwindles for survivors days after deadly Afghan quake